Budget Control and Dynamic Cost Estimate
Typical Problems :
PSS Answers :



- The standard budget structure can be freely designed over 4 levels.
- The tree view shows always the 100 % of the structure of the standard budget structure.
- The symbols in the tree view show , if the position is a summary position or an input position or if the budget is lower than the actual prognosis.
- The situation per budget position shows all related commitments , risks and invoices.
- The values of the actual cost estimate can be automatically taken over as a budget with a special procedure.
- All changes of the budget are recorded in an inaccessible history field
![]()

- Comprehensive reports are available to show any deviations between commitments, cost estimates and budget.
- Traffic light symbols in the reports make it easy to spot the problem areas and to evaluate the effect on the overlying objects.
- This reports are available on all object levels, they can be given out according to the object structure or acc to the element structure
- Progress reports show the curves of cost estimates and actual values over the time axis